The tertiary care hospital on the King Edward Medical University campus at Muridke, Punjab

The practice

Consulting engineers and architects, Karachi, since 1982

ATIF NAZAR (Pvt.) Ltd. plans, designs and supervises institutional buildings, teaching hospitals, university campuses, naval and security-force facilities, for public-sector clients in Pakistan and abroad. In 2025 the practice won the FIDIC Asia Pacific Project Award for the Gambat teaching hospital, built for the Government of Sindh.

Who we are

One office, one contract

The firm was established in Karachi by Engr. Nazar Siddiqui as Atif Nazar Associates, and entered on the Pakistan Engineering Council register on 4 June 1982. It practises today as ATIF NAZAR (Pvt.) Ltd., led by his sons, Engr. Atif Nazar Siddiqui, Chief Executive, and Engr. Wasif Nazar Siddiqui, Managing Director.

It is registered with the Pakistan Engineering Council (PEC) as a consulting engineering firm, and is a member of the International Federation of Consulting Engineers (FIDIC) and the Association of Consulting Engineers, Pakistan (ACEP).

Project management, planning, architecture and the engineering disciplines are held in the same office. On the Pir Abdul Qadir Shah Jeelani Institute of Medical Sciences at Gambat and on PNS Shifa, Karachi, a single contract covers master planning, architecture, structural and MEP engineering, road and infrastructure engineering, and project management, the client co-ordinates one consultant, not a separate firm for each discipline.

Where the work is

Healthcare
PAQSJIMS, Gambat; PNS Hafeez, Islamabad; PNS Shifa, Karachi
Education
KEMU campus, Muridke; SZABUL, Karachi; MNU medical school, Maldives
Defence
ASF Academy, Karachi; naval facilities, for the Pakistan Navy
Infrastructure
Munawar Chowrangi underpass and Karachi road schemes, for the KDA
Pir Abdul Qadir Shah Jeelani Institute of Medical Sciences, a teaching hospital and medical college at Gambat, Khairpur District, Sindh

Government of Sindh / 37 acres, Khairpur

Pir Abdul Qadir Shah Jeelani Institute of Medical Sciences, Gambat

The measure of the practice

37acres

PAQSJIMS, Gambat

Winner of the FIDIC Asia Pacific Project Award 2025, for the Government of Sindh.

1982

On the PEC register

Entered on 4 June 1982 and practising continuously since.

464,746sq ft

ASF Academy, Karachi

Master planned, designed and supervised on a 70-acre site.

203.77acres

KEMU campus, Muridke

Master plan and building designs for King Edward Medical University.

Method

How a project runs

From the first survey to handover, under one contract. The stages below are the ones the practice is retained for, in the order they run.

The airport training arena and its approach road at the ASF Academy, Karachi
ASF Academy, airport training arena, Karachi
  1. 01

    Feasibility and survey

    Site levels, constraints and access; topographic, geotechnical and hydrological survey; technical and financial feasibility; and the regulatory clearances a scheme needs before it can proceed.

  2. 02

    Master planning

    Land use, levels, circulation, phasing and the position of every block, settled before any building is drawn, from an 8.47-acre law campus at Korangi to the 203.77-acre King Edward Medical University campus at Muridke.

  3. 03

    Design, coordinated in one office

    Architecture, structural, MEP, road and infrastructure engineering carried by one firm rather than split between consultants. At Gambat that ran from the campus master plan to a trauma centre, a burns centre and three transplant centres, liver, kidney and bone marrow, inside one complex.

  4. 04

    Tender documentation and contract conditions

    Bid documents and evaluation, and the conditions of contract the works are let under, FIDIC, GCC-standard, MDB Harmonised or bespoke, which is what a donor-funded project turns on.

  5. 05

    Construction supervision and quality assurance

    The drawings checked against what is actually built. On the SZABUL Korangi campus and the ASF Academy, supervision and quality assurance sit inside the same contract rather than in a separate one.

  6. 06

    Phasing around a working facility

    Where a building has to stay in service, the programme is planned around it. The PNS Shifa upgrade was phased around vacant parts of the 60-acre site so the Pakistan Navy's principal hospital in Karachi kept working throughout.

Credentials

Registrations, licences and memberships

What a procurement officer can check. Licence and registration details are available on request.

Pakistan Engineering Council (PEC)

Registered consulting engineering firm. The practice has been on the PEC register since 4 June 1982.

International Federation of Consulting Engineers (FIDIC)

Member of the global federation representing the consulting engineering industry. Winner of the FIDIC Asia Pacific Project Award 2025, in the outstanding-infrastructure-project category, for the Pir Abdul Qadir Shah Jeelani Institute of Medical Sciences at Gambat.

Association of Consulting Engineers, Pakistan (ACEP)

Member. The Managing Director serves as Honorary Secretary.

Engineering-in-Chief (E in-C)

Approved consultant for military and defence infrastructure projects.

Capital Development Authority (CDA)

Authorised consultant for projects in the federal capital territory.

Federal Board of Revenue (FBR)

Registered and compliant for professional services.

Sindh Revenue Board (SRB)

Registered consultant for professional services in Sindh.

Balochistan Revenue Authority (BRA)

Authorised consultant for projects in Balochistan.

Next step

Request the firm profile and registration details

Tell us the sector and the procuring agency, and we will send the firm profile and registration particulars together with the project record closest to your requirement.