Two ground-plus-fifteen residential towers for Sindh Government officers, 60 apartments in all on a 26,300 sq ft plot.

Client
Government of Sindh
Location
Bath Island, Karachi
Plot area
26,300 sq ft
Covered area
168,000 sq ft

Above — The residential blocks — architect's render

Overview

Project overview

The Sindh Government appointed the practice to design two residential blocks in GOR-I at Bath Island, Karachi. Each is ground plus fifteen storeys; one is for Grade-17 officers and one for Grade-19, and each holds 30 apartments. Together they come to 168,000 sq ft on a plot of 26,300 sq ft.

That ratio is the project. Fitting 60 households onto just over half an acre in a prime locality means building tall and taking everything else below or behind: 105 car parking spaces, a security room, a standby generator room, firefighting systems, a garbage chute, a cargo lift and passenger lifts.

The apartment layouts are planned for privacy and ease of movement within the flat, and the blocks are kept plain — clean building forms, secure access, well-planned services — rather than dressed up.

Scope

Scope of works

The facilities covered by our work on Residential Blocks in GOR-I, Bath Island, Karachi.

  1. 01Grade-17 block, 75,000 sq ft, 30 apartments, ground plus fifteen
  2. 02Grade-19 block, 93,000 sq ft, 30 apartments, ground plus fifteen
  3. 03105 car parking spaces
  4. 04Standby generator, firefighting, cargo and passenger lifts

Drawings

The blocks, as drawn

Renders of the principal blocks at Bath Island, Karachi.

Residential Blocks in GOR-I, Bath Island, Karachi, Bath Island, Karachi — view 2

Residential Blocks in GOR-I, Bath Island, Karachi

Next step

Planning a facility like this one?

We are the consulting engineers on Residential Blocks in GOR-I, Bath Island, Karachi. Tell us what you are planning and we will set out the scope, the team and the sequence of work.