Design and feasibility commission
Underpass and Flyover at Maskan Chowrangi
An underpass on one side of Maskan Chowrangi and a flyover on the other, taking the through movements across a junction with no room for a roundabout.
- Location
- Maskan Chowrangi, Gulshan-e-Iqbal, Karachi
- Est. scheme cost
- Rs 1,800 million
- Programme
- 3 years
Above — Proposal render — the flyover and underpass carrying the through movements across Maskan Chowrangi.
Status
Design and feasibility commission
Prepared as a design and feasibility commission. No Annual Development Programme number appears in the scheme documents, so none is quoted here.
Overview
Project overview
Two movements make Maskan Chowrangi hard to clear: Abul Hassan Isphahani Road to Allama Shabbir Ahmed Road, and Allama Shabbir Ahmed Road to University Road. There is no space at the junction for a roundabout.
We prepared the feasibility and design for the only arrangement the site allows — an underpass on one side and a flyover on the other, carrying the through traffic across the junction, with an at-grade U-turn and cross sections drawn for road corridors between 25.3 m and 40.5 m wide.
The figure given below is the estimated value of the scheme, not the practice's fee. Every view on this page is a proposal drawing or render.
Scope
Scope of works
The elements of the scheme as designed at Maskan Chowrangi, Gulshan-e-Iqbal, Karachi.
- 01Underpass on one side of the junction
- 02Flyover on the other side
- 03At-grade U-turn
- 04Main carriageways, service roads and footpaths within the corridor
The submission
Plans, sections and proposals
Layout plans, typical cross sections, proposal renders and site photographs from the Underpass and Flyover at Maskan Chowrangi submission. Every figure is captioned for what it is.

Proposal — the underpass approach, with signage to University Road and Sohrab Goth.

Proposal — the underpass ramp, with signage to University Road and Gulshan Chowrangi.

Proposal — the flyover where it passes Karachi University.

Existing condition — traffic at the junction.
Next step
Planning a scheme like this one?
We prepared the feasibility and design for Underpass and Flyover at Maskan Chowrangi. Tell us what your authority is planning and we will set out the survey, the design and the sequence of work.