Site record, 29 October 2024 — the roundabout kerb and the road formation on the alignment at Keamari. Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay, Moach Goth to Hawkes Bay, Karachi

Under construction on the record

Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay

A link road with a lined nallah alongside it, from the RCD Highway at Moach Goth to Hawkes Bay, with a roundabout and box culvert crossings.

Commissioned by
Karachi Development Authority (KDA)
Location
Moach Goth to Hawkes Bay, Karachi

Above — Site record, 29 October 2024 — the roundabout kerb and the road formation on the alignment at Keamari.

Status

Under construction on the record

Construction was under way in late 2024. The evidence is the practice's own dated, geotagged site record — photographs stamped between August and November 2024 at Keamari and Hawkes Bay Town showing subgrade compaction, grading, kerb laying and channel reinforcement on this alignment. No public completion notice has been found, so the scheme is described as under construction and not as delivered. It should not be confused with the separate Hawkes Bay Road reconstruction from Y Junction to Machli Chowk, awarded in 2026.

Overview

Project overview

The route connects the RCD Highway at Moach Goth to Hawkes Bay and carries a lined drainage channel alongside the carriageway along its length. It was drawn for the Karachi Development Authority, whose title block appears on the layout plan, and the alignment is set out to allow Baldia Stadium Road to be brought onto the nallah road later.

We prepared the alignment, the carriageway and channel design, the cross sections along the route and at the roundabout, and the box culvert crossings. The practice's own dated site record shows the work being built: earthworks and subgrade compaction, grading, kerb laying and reinforcement of the lined channel, photographed on the alignment between August and November 2024.

Scope

Scope of works

The elements of the scheme as designed at Moach Goth to Hawkes Bay, Karachi.

  1. 01Link road from the RCD Highway at Moach Goth to Hawkes Bay
  2. 02Lined nallah alongside the carriageway
  3. 03Roundabout on a 100 m right of way
  4. 04Box culvert crossings
  5. 05Provision for a future connection to Baldia Stadium Road

The submission

Plans, sections and proposals

Layout plans, typical cross sections, proposal renders and site photographs from the Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay submission. Every figure is captioned for what it is.

Site record, 28 October 2024 — grading and compaction of the subgrade. Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay, Moach Goth to Hawkes Bay, Karachi

Site record, 28 October 2024 — grading and compaction of the subgrade.

Site record, 4 September 2024 — reinforcement in place for the lined channel. Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay, Moach Goth to Hawkes Bay, Karachi

Site record, 4 September 2024 — reinforcement in place for the lined channel.

Existing condition — the unlined nallah where it runs through the built-up area. Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay, Moach Goth to Hawkes Bay, Karachi

Existing condition — the unlined nallah where it runs through the built-up area.

Layout plan for the Karachi Development Authority — the link road and nallah between the RCD Highway at Moach Goth and Hawkes Bay. Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay, Moach Goth to Hawkes Bay, Karachi

Layout plan for the Karachi Development Authority — the link road and nallah between the RCD Highway at Moach Goth and Hawkes Bay.

Next step

Planning a scheme like this one?

We prepared the feasibility and design for Link Road and Nallah, RCD Highway at Moach Goth to Hawkes Bay. Tell us what your authority is planning and we will set out the survey, the design and the sequence of work.